How to order?

Procedure
ordering

1. model selection

The first step is to check the requirements in the local zoning plan.

Not everywhere in Poland can erect single-story houses with a flat roof. If a specific roof angle is required, choose one of our models with pitched roofs.

When deciding on a house from our offer, it is necessary to calculate the total cost of services:

– House model (e.g. GX35)
– Transportation (depends on distance)
– Foundations
– Extras (e.g. heating)

At this stage, the client already knows the final price, with no hidden costs.

4. delivery and installation

After final acceptance at the manufacturing plant and final payment, the house is transported to the customer by HDS trucks.

The house arrives divided into 6m x 3m modules. On site, they are set on the foundations and the assembly stage begins. For a plaster façade, it normally takes 2-3 days. For wooden facade it is 1 day. If the customer plans to rearrange the house in the future, the modules are bolted together. Otherwise, we spot weld the steel frames. From the time the work is completed, the customer has warranty protection of 5 years to repair defects.

– Installation 2-3 days
– Fully finished facade
– Insured transportation
– Warranty 5 years

2. design modification

After signing the contract, the client arranges a meeting with our architect.

The offer for each model of the house provides for changes in the division of rooms. Changing the position of glazing is also possible. In addition, the cost of the wall with insulation and glazing is comparable so you can add or subtract a window. During consultations with the architect, the arrangement of installation leads is also determined.

– Room division
– Arrangement of leads
– Location of windows
– Number of windows

3. house construction

The house is built in a production facility. During production, the customer has the opportunity to see his house at every stage of assembly.

Construction of a 70m2 house usually takes 14 days. After this time, the house is set up on the square in front of the production hall. Then the customer is invited to a technical reception. At this stage, the house is completely finished in the case of wooden elevation. In the case of plastered elevation, the house is with a layer of mesh applied with glue and our team plasters the building only after installation at the customer’s site.

– Fast
– Professional
– Inspection at every stage
– Final acceptance

Contact

Phone – 504-372-001
Phone – 517-911-966
Phone number – 504-372-001
Email – biuro@moduleodomy.pl
Address – Jedlnia 133D
26-670 Pionki(by the road Radom – Kozienice)
First Name
Email
Last Name
Message
Formularz został przesłany pomyślnie!
Wystąpił błąd podczas przesyłania formularza. Prosimy o ponowną weryfikację wszystkich pól formularza.

WHY WE?

The most important thing for us is the quality of project execution, timeliness and contact with the customer.

We strive to make each project proceed in a creative and flexible atmosphere, with customer satisfaction as the most important point.

FAST EXECUTION

We guarantee prompt execution of each project.

CONTROL AT EVERY STAGE OF CONSTRUCTION

We ensure the highest quality through strict control at every stage of construction.

FRIENDLY AND PROFESSIONAL SERVICE

We provide friendly and professional service at every step of cooperation.

BUDGET CONTROL

We keep a close eye on the budget to ensure that every investment is fully transparent and in line with the financial plan.

MULTI-YEAR WARRANTY

As one of the few companies on the Polish market, we offer a 30-year warranty on the construction of our houses and a 5-year warranty on latent defects and other construction work.